




Black Friday Offer! Get Up to $330 OFF per electric bike until stock lasts. Use code: “BlackFriday”
Safe, Smart, And Continuously Evolving: The advanced Battery Management System and LiFePO4 chemistry bring the EP500/PRO incredible safety and durability. With the built-in dual-core microcomputer and Internet connection, the EP500’s firmware can be upgraded through your internet connection. There is no best, only better!
Seamless UPS Backup: The EP500/PRO will automatically become your home energy source for essential loads when the electrical grid goes down. Unlike gasoline generators, BLUETTI EP500/PRO keeps your lights on and laptops charged without upkeep, fuel, carbon monoxide or annoying noise. Pair with up to 1200W MPPT solar input to rapidly recharge or to keep your appliances running without depleting the onboard battery. Remember when you had to worry about a power outage? Worry no longer, Meet BLUETTI EP500/EP500PRO.
You Can Use Free Return Service For All Products.
1)For non-solar-powered household circuits:
An electrician with a professional technician certificate is required to install the in-grid power system, connect the wires of critical equipment from your main electrical box to the BLUETTI UPS BOX. When the power fails, it will automatically switch to EP500 or EP500 Pro for the power supply. The connection method: power grid–home main circuit–BLUETTI UPS box–EP500 or EP500Pro–critical equipment (such as refrigerator, electric light, and server).
2)Solar-powered UPS:
1.If the open-circuit voltage of the solar panels is within the specified input range of EP500, they can be directly connected into EP500 or EP500Pro through the MC4 port connectors to build up the UPS system.
2.If the open-circuit voltage of your panels exceeds the input limitation of EP500 or EP500Pro, they need to pass the “”PV step-down module”” to decrease the voltage before connecting into the system. The connection method is solar panels–PV step-down module–EP500 or EP500Pro–critical equipment (such as refrigerator, electric light, and server).
Yes, you can. Turn off EP500 or EP500Pro first, and then unplug the cable on it, remind to set the Max. Grid Current to 15A.
Yes, you can. However, it must meet:
1)Open Circuit Voltage(OCV):
EP500: 55-145V/Max.20A, Max.1200W.
EP500Pro: dual MPPT,each is 35-150V/Max.12A,1200W Max. (2400W Max. For dual connection).
2)Suitable MC4 connector.
3)We recommend that the solar panels to be connected should be of the same brand.
The charging power will work at only 60W at most instead of 30W if the USB-C cable does not have 5A MFI certification.
No, for the 30A large-current, the other ports besides 12V/30A RV ports won`t work. In addition, you must cover the rubber plug when the DC is turned on and the 12V/30A port is idle , otherwise it may cause a short circuit if the cable falls in.
1) There is only one AC port marked 4000W/220-240 (or 6000W/220-240) on the Split Phase Fusion Boxes that can power the High-voltage devices. Other 6 AC ports cannot load more than 2000W on EP500 (3000W on EP500Pro).
2) Under Split Phase Bonding mode, the total load power of all AC ports (on the machine and Split Phase Fusion Boxes) can not exceed 4000W for EP500 (6000W for EP500Pro).
If any one of the two EP500(or EP500Pro) runs out of power, the high-voltage output ports on the Split Phase Fusion Boxes will stop outputting power. The machine which still has the power needs to be set to ”Single Phase” mode manually.
No. Only applicable to units of the same model and specifications. For example, two EP500 or two EP500Pro are recommended. Besides, the Split Phase Fusion Boxes also are different.
No Satisfied? No Worries,
Return For Full Refund.
We are Here 7 Days a
Week to Help.
Most Orders are Delivered
in 3 to 7 business Days.
We Usually Post Offers, Promotions and Important Products Updates via Newsletter.